Profile image

Metalmarine 11m interceptor (U.S coast guard)

8,053 Jerushah  6.6 years ago

To move across the water.....

Use throttle to accelerate
Use roll to turn

To use the AK-47.....

Use VTOL to move gun right to left
Use trim to move gun up and down

The Long Range Interceptor (LRI) is an 11-meter (35 feet) high speed launch vessel designed to be deployed from United States Coast Guard cutters via a rear launching ramp. The Long Range Interceptor is an aluminum rigid hull inflatable boat (RHIB), powered by Ultrajet brand water-jets, for intercepting and boarding suspect vessels. It mounts a radar, special shock-proof seats, and can travel at 35 knots. They can be armed with machine guns or grenade launchers, and have ballistic panels for crew protection.

The National Security Cutters (NSC) have a rear launching/retrieval ramp, and carry two launches, either two of the smaller 7-meter USCG Short Range Prosecutors, or two USCG Long Range Interceptors, or one of each.

Under the Integrated Deepwater System Program, the US Coast Guard's outside private contracting company, Integrated Coast Guard Systems (ICGS), signed a $2.9 million contract for the construction of one Long Range Interceptor in February 2006 with Willard Marine. However, because the LRI's design did not meet Coast Guard's requirements, the Coast Guard planned to hold a full and open competition for additional LRIs that would comply with future NSCs requirements.

In June 2012, the United States Coast Guard selected MetalCraft Marine U.S. in Cape Vincent, New York, and awarded a five-year production contract with a potential total value of up to $10.2 million with the option to build up to ten of the latest version of the Long Range Interceptor (LRI-II). On December 12, 2013, the Coast Guard placed a delivery order valued at $3.973 million for the first four LRI-II cutter boats. The first LRI-II was delivered on February 20, 2013, and commenced testing aboard the Coast Guard's first National Security Cutter, the USCGC Bertholf (WMSL-750). The LRI-II project was approved for full-rate production on June 27, 2013, after successful operational and interface testing activities with the Bertholf. The third LRI-II was delivered in November 2014 to the USCGC Waesche (WMSL-751), and the fourth LRI-II was delivered in February 2015 to the fourth NSC, the USCGC Hamilton (WMSL-753). By that time, the Coast Guard had ordered six LRI-IIs from MetalCraft.

Spotlights

General Characteristics

  • Successors 2 airplane(s)
  • Created On iOS
  • Wingspan 15.9ft (4.8m)
  • Length 56.8ft (17.3m)
  • Height 22.1ft (6.7m)
  • Empty Weight 47,442lbs (21,519kg)
  • Loaded Weight 65,410lbs (29,669kg)

Performance

  • Power/Weight Ratio 1.03
  • Horse Power/Weight Ratio 0.03
  • Wing Loading 97,229.7lbs/ft2 (474,716.8kg/m2)
  • Wing Area 0.7ft2 (0.1m2)
  • Drag Points 24190

Parts

  • Number of Parts 373
  • Control Surfaces 0
  • Performance Cost 1,028
  • Log in to leave a comment
  • Profile image
    101k Wallaby

    @Jerushah np!

    6.6 years ago
  • Profile image

    @Jerushah no problem

    6.6 years ago
  • Profile image
    8,053 Jerushah

    Thank you @AceOfSpade @ForeverPie and @RailfanEthan

    6.6 years ago
  • Profile image
    8,053 Jerushah

    Thank you so much!!!!!!!!!!!!! @EternalDarkness

    6.6 years ago
  • Profile image
    8,053 Jerushah

    I am so sorry guys this is my final version of this ship

    6.6 years ago