Profile image

Breakdown Train

30.5k DDVC  3.1 years ago
131 downloads

The Breakdown Train is composed of two cranes, flatbeds and a coach for the workmen.

No additional control this is only for pushing, pulling, and shunting. The cranes cannot rotate.

This build contain:

2 Cranes
2 Flatbeds
1 Works Unit Coach

alt text
alt text
alt text
alt text

Note:
- The thumbnail was recreation from episode 7 "Thomas and The Breakdown Train" from season 1. He did not bring the Works Unit Coach on the episode.
- Engine not included.

Enjoy, Thank you!

Spotlights

General Characteristics

  • Successors 1 airplane(s)
  • Created On Android
  • Wingspan 9.0ft (2.8m)
  • Length 128.0ft (39.0m)
  • Height 14.1ft (4.3m)
  • Empty Weight 152,002lbs (68,947kg)
  • Loaded Weight 152,002lbs (68,947kg)

Performance

  • Wing Loading 439,839.3lbs/ft2 (2,147,483.6kg/m2)
  • Wing Area 0.0ft2 (0.0m2)
  • Drag Points 23582

Parts

  • Number of Parts 813
  • Control Surfaces 0
  • Performance Cost 2,698
  • Log in to leave a comment
  • Profile image
    30.5k DDVC

    @IdnManufacturer ok, terimakasih.

    +1 3.1 years ago
  • Profile image

    @NWRNo1 ohh ya,saya ingat.crane kirow,gerbong penolong sama gerbong yang kayak gerbong datar itu

    +1 3.1 years ago
  • Profile image

    That should be a meme
    Me: someone please make that a meme

    +1 3.1 years ago
  • Profile image
    30.5k DDVC

    @Hiyret10292020209 Thank you

    3.1 years ago
  • Profile image

    Good job!

    +1 3.1 years ago
  • Profile image
    30.5k DDVC

    @IdnManufacturer nggak tau, tapi cuma nemu ini

    +1 3.1 years ago
  • Profile image

    Kalau di Indonesia apa namanya ya? Saya udah lupa

    +1 3.1 years ago